Log in

4026 search results for "zero lot line"

Forum
Topic

Net Zero Data Center

NC-v4 EAc2: Optimize Energy Performance
posted by Amal Venugopal on Feb 14, 2022, 7:37 am

Hi All, Greetings!.. Our team is creating the energy model for the Data Center. It is estimated that 4MW of energy will be consumed by the Data Center. The Data Center is powered by a substation which is connected to a 13MW solar PV plant. In addition to ...

Last reply: Marcus Sheffer, Feb 22, 2022, 12:32 pm

Non-certified buildings in LEED boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by chila chila on Jan 19, 2021, 9:07 am

Hi everyone, The project area has two main buildings: a new construction building (office) and a renovation of an existing building (gym),  that is not planned for LEED certification. Just the new building will apply for LEED v 4- NC certification. They are totally separate buildings in terms of air-conditioning and water systems but share the same landscape and parking lot. The excavation and demolition activities will involve the entire area at the same time; after that the new construction and the associated shared parking will be constructed, then the renovation will take place. It is not clear...

Last reply: Antti Karppinen, Feb 22, 2022, 5:58 am

Tool/database for Opt 1?

NC-v4.1 LTc3: High Priority Site and Equitable Development
posted by emily reese moody on Feb 10, 2021, 6:18 pm

they couldn't figure out how to get the right info. I've been able to qualify many-a-project using just two websites; BUT, it took me a whole lot of googling when v4 first came out to find those two. Log...

Last reply: Grace Friedhoff, Feb 21, 2022, 4:02 pm

Core and Shell

CS-v4 EAp1: Fundamental commissioning and verification
posted by Bryan Markkanen on Jun 4, 2021, 10:46 am

statement and clarified a lot: All energy-related systems that are installed as part of the core and shell project must be commissioned in order to comply with the prerequisite. Some commissioning activities...

Last reply: Bryan Markkanen, Feb 18, 2022, 3:07 pm

Preschool child toilet rooms- no urinals

NC-v4 WEp2: Indoor water use reduction
posted by Lyle Axelarris on Jul 8, 2021, 12:34 pm

a number of uses based on the typical length of time a child spends there and make sure their kitchen sink / shower uses are zero.  Log in or register to post comments emily reese moody Sustainability...

Last reply: Summer Minchew, Feb 17, 2022, 12:59 pm

Minimum Energy Performance Review Phase

CS-v4 EAp2: Minimum Energy Performance
posted by Eric Kim on Feb 15, 2022, 1:41 am

Eric Kim LEEDuser Basic Member 1 thumbs up February 15, 2022- 6:56 pm Thank you for your answer. Marcus, It helped a lot. Log in or register to post comments ...

Last reply: Eric Kim, Feb 15, 2022, 6:56 pm

Surrounding Density and Diverse Uses

NC-v4.1 LTc4: Surrounding density and diverse uses
posted by mika sundberg on Jan 30, 2022, 6:51 pm

I have a question about what Path 2- connected site and whether a project has been previously developed. I am working on a project that is situated adjacent to a park. The park has been graded, there are paths (gravel and concrete), play structures, picnic shelters and a parking lot. Can this be considered previously developed? LTc4 ...

Last reply: Deborah Lucking, Feb 11, 2022, 11:54 am

Bird Collision Deterrence – Performance Monitoring Plan

NC-v4 INc1: Innovation
posted by Verde Design on Dec 10, 2019, 10:49 am

Please share any other potential insight which you render useful. Thanks a lot! Bests, Hashir Log in or register to post comments ...

Last reply: Hashir Usman, Feb 7, 2022, 3:57 am

EA prerequisite and Option 2. Prescriptive compliance: ASHRAE 50% Advanced Energy Design Guide for Warehouses

Warehouses-NC-v4 EAp2: Minimum Energy Performance
posted by Carine HUANG on Jan 20, 2022, 10:59 am

Stores. Achieving 50% Energy Savings  Toward a Net Zero Energy Building".  Could you please advice me on the most appropiate guide to follow? Best regards,  EAp2 France ...

Last reply: Marcus Sheffer, Feb 4, 2022, 10:39 am

Not sure I'm satisfied with this credit

Pilot-Credits MRpc127: Timber Traceability
posted by Raphael Sperry on Mar 27, 2019, 1:32 am

and this is an important goal. The Legal Wood Pilot credit contained very close to zero actionable guidance on how to avoid illegal wood. My hope is that if the approach taken in this credit is proven out, an improved...

Last reply: Leanne Conrad, Jan 28, 2022, 2:54 pm