4026 search results for "zero lot line"
Topic | Recent |
---|---|
Advanced Gas Meter and SubmeterNC-v4 EAc3: Advanced Energy Meteringposted by Edgar Arevalo on Aug 16, 2022, 10:05 amIt's been pretty easy to find advanced electrical submeters that meet all the characteristics from LEED, but it's been such as challenge to find one for natura gas intake. Has anyone found a manufacturer that develops advanced gas metering that can be installed on the incoming service to the bulding, and advanced gas submetering that can installed on the gas line going into the boilers, with both having the required LEED characteristics? EAc3 United States ... Last reply: Marcus Sheffer, Aug 16, 2022, 12:32 pm |
|
Lighting control + color rendering requirements for v4.1NC-v4.1 EQc6: Interior lightingposted by Ashleigh Fischer on Aug 11, 2022, 2:29 pmBryna Dunn Vice President Moseley Architects LEEDuser Premium Member 10 thumbs up August 12, 2022- 4:49 pm My guess is that you found an error in the reference guide. Curiously, that same line was in the April 2021 version and in the November 2020 version. But since that requirement is not in the actual balloted rating system, I do not believe it can be introduced in the unballoted reference guide. I personally think it might have been inadvertently pasted there and then just overlooked (until now!). Log in or register to post comments emily reese moody Sustainability Director, Certifications &... Last reply: emily reese moody, Aug 14, 2022, 1:07 pm |
|
Phased Development- Demoing Building for Parking LotNC-v4 MPR2: Must use reasonable LEED boundariesposted by Deb Favaretto on Jul 20, 2022, 12:52 pmfactory, next to the existing factory, and modified the site in Phase 1...and certified this new factory in Phase 1. Phase 2 included the demolish of the old factory and install of a new parking lot where the old factory was. This new parking lot now serves the newly built LEED certified factory. In our LEED application we drew the LEED Project Boundary around the new factory and the immediate site area. We... Last reply: Dave Hubka, Aug 13, 2022, 9:23 am |
|
LEM category selection for wood ceilingsCI-v4.1 EQc2: Low emitting materialsposted by Tricia M on Aug 3, 2022, 10:10 amfabricated and are assembled on site using carpentry tools, and would be categorized as COMPOSITE WOOD. Trusting that line of thinking moves towards a solution for the compliance ratings-... Last reply: Megan Leslie, Aug 9, 2022, 1:44 pm |
|
Central shower amenities, but outside LEED boundaryNC-v4 LTc6: Bicycle facilitiesposted by emily reese moody on Jul 5, 2018, 2:37 pmto scope. While a lot of the most readily available literature focuses on home water savings, pulling materials on the relatively low cost of efficient showerheads and a rough magnitude of water utility... Last reply: Erin Holdenried, Aug 4, 2022, 3:49 pm |
|
Default Gravel SRI ValuesNC-2009 SSc7.2: Heat island effect - roofposted by Annalise Reichert on Jan 20, 2015, 1:58 pmhelps me on a lot of projects. See LEED interpretations #2450 and #10113. #10113 says "to determine the SRI value for materials that do not have recognized standard values (e.g. new gray concrete)... Last reply: Erin Holdenried, Jul 28, 2022, 9:08 am |
|
LEED boundary- disturbed land that will support more than the projectNC-v4.1 MPR2: Must use reasonable LEED boundariesposted by Kimberly Reddin on Jul 25, 2022, 11:11 amon, but it's only contiguous if we re-draw what I had considered a reasonable LEED boundary for our addition to include a lot of existing site (that we hadn't planned to alter) between... Last reply: Kimberly Reddin, Jul 28, 2022, 9:08 am |
|
v4.1 Addenda and TripsNC-v4.1 LTc5: Access to quality transitposted by Jessica Eskro on Jan 18, 2022, 2:57 pmto project-sponsored transit. The rating system does state that for public transit, "For each qualifying transit route, only trips in one direction are counted towards the threshold." Bus lines connecting to metro lines was a v2 / v2009 option (https://www.usgbc.org/leedaddenda/100001163). It does not apply to v4 or v4.1. Log in or register to post comments ... Last reply: Emily Purcell, Jul 27, 2022, 11:47 am |
|
Form-Surrounding Density and Diverse UsesCI-v4 LTc2: Surrounding density and diverse usesposted by Suong Mateos on Jul 12, 2022, 1:27 pmWhat is the difference between the Use Label on Map and the Use Type? I am able to freely input the Use Label on Map but the Use Type does not allow for any type of input or provide a pull-down. I'm using Bluebeam and able to add lines and type. LTc2 United States ... |
|
Option 1 documentationNC-v4 LTc4: Surrounding density and diverse usesposted by Sue Bryant on Jun 13, 2017, 1:57 pmto the calculation on your project? Like, if you open Google maps and draw some 1/4 mile lines from your boundary, does that add a lot of land but no new buildings? If not, I'd contact LEED Coach or customer... Last reply: Nicole Keeler, Jul 15, 2022, 3:22 pm |