Do staff lounges, waiting rooms, family rooms and religious spaces count?Healthcare-v4 SSc7: Places of respiteposted by Kendall Claus on Sep 14, 2023, 9:43 pmUmesh Atre Sustainability Lead Parkhill LEEDuser Basic Member 10 thumbs up October 5, 2023- 4:48 pm Hi Kendall- As you know, indoor spaces can count towards only 30% of the total, but assuming you have the rest covered through outdoor spaces, so long as all the requirements listed under the credit are met (mainly the 90% direct line of sight access to views of nature), I believe you could use the spaces you have listed. This credit is all about health benefits tied to access to nature, fresh air, daylighting, views, relaxation, stress relief, etc. Hoping this helps. Log in or register to post... Last reply: Umesh Atre, Oct 5, 2023, 4:48 pm |
|
No Exterior Lighting QueryEBOM-v4.1 SSc3: Light Pollution Reductionposted by Wafa Arif on Oct 2, 2023, 7:51 amthen it is exempt. Provide this IES file or cutsheet as your documentation it is exempt. 3. If this is exempted you can claim the credit. The form gets a little weird when there are zero lights. You may need... Last reply: Bill Swanson, Oct 5, 2023, 9:42 am |
|
Pilot Credit MRpc131: Circular ProductsNC-v4 INc1: Innovationposted by Amber Morris on Jan 6, 2021, 11:39 amfor compliant products that align with our project scope and have found the Zero Waste and Closed Loop Certified to be the most viable criteria at the moment. We have not submitted for review but I also plan... Last reply: Sara O'Mara, Oct 4, 2023, 5:00 pm |
|
Requirements for green vehicle category?CS-v4 LTc8: Green vehiclesposted by Marine Petrosyan on Oct 2, 2023, 6:13 amEmily Purcell Sustainable Design Lead CannonDesign LEEDuser Expert 369 thumbs up October 2, 2023- 2:06 pm LEED does not specify how this gets managed during operation, they are just looking for signage (or a preferred permit process / discounted fee if that applies to your site). The v4.1 version of this credit removed the preferred parking requirement and only requires EV-ready or EV charger spaces, which is more in line with local EV requirements and market demand in my experience. Log in or register to post comments Marine Petrosyan Project Manager Energy Systems LLC LEEDuser Basic Member... Last reply: Marine Petrosyan, Oct 2, 2023, 3:39 pm |
|
AEDG for LibrariesCI-v4 EAp2: Minimum Energy Performanceposted by Edgar Arevalo on Aug 14, 2023, 10:45 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up August 17, 2023- 12:41 pm I don't think that there is an applicable AEDG for a library. You could try to use the small to medium office one and see if the reviewer would accept it. Log in or register to post comments Edgar Arevalo Associate LEEDuser Basic Member 18 thumbs up September 25, 2023- 5:47 pm Ok thank you. I do have another question, because this library is a commercial interior project, a lot in the Envelope section of the AEDG does not apply because it's not in the scope of work... Last reply: Marcus Sheffer, Sep 29, 2023, 3:19 pm |
|
When Did the v4 Water Metering Credit Change?NC-v4 WEc4: Water meteringposted by Kyle G. Pearson on Sep 22, 2023, 12:42 pmthe start, because, as you noted, these are usually served by the same lines as dishwashers, mop sinks, drinking fountains, etc. If you are going to use this option, the plumbing engineer needs to layout the system with this in mind. We usually select landscape irrigation and domestic hot water for our two systems. The key for the latter is to avoid instahot type systems. Then you can meter the line out... Last reply: Glen Boldt, Sep 28, 2023, 12:28 pm |
|
Adhesive used in the project to bond laminate to wood substrateCI-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Marie Kranjack on Oct 11, 2012, 11:19 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up October 16, 2012- 1:33 pm Marie, I don't want to point fingers, as the LEED reviewers have a tough job and get a lot of flak, but this appears to be like reviewer error—not understanding what was going on with the project.It's fortunate that this apparent error did not affect your certification goals. Log in or register to post comments Susan Walter HDR LEEDuser Expert 1296 thumbs up October 16, 2012- 2:54 pm It looks like the interpretation of laminating assemblies is different. Most... Last reply: Catarina Costa Goncalves, Sep 26, 2023, 9:55 am |
|
HumidifierNC-2009 EAp2: Minimum Energy Performanceposted by Maria Spastri on May 22, 2017, 6:04 pmMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up May 22, 2017- 6:34 pm Humidification is considered a process load so it must be modeled identically. Report the energy use as a separate line item in the modeling results. Often the energy use is not identical even when modeling identical humidification systems. Log in or register to post comments Maria Spastri Sustainability Consultant AECOM LEEDuser Basic Member May 22, 2017- 7:21 pm Hi Markus, thanks for the prompt reply. The proposed system uses electricity for the heating and humidifier. The baseline system uses gas... Last reply: Marcus Sheffer, Sep 14, 2023, 9:20 am |
|
Police Headquaters and Public Services BuildingNC-v4 LTc7: Reduced parking footprintposted by Marlene Borruso on Dec 12, 2018, 8:47 amI am currently working on a Police Headquarters and Public Services Building. This project utilizes a parking deck adjacent to the building and reserving spaces for both police vehicles, staff vehicles; while public visitors will have access to paid parking not specifically reserved for the building. How do we calculate a baseline to define the reduction? There is no real base line indicated on the chart. Also, how do you handle parking required by the police for vehicles that are used as tools of the trade? LTc7 ... Last reply: Danielle Waters, Sep 13, 2023, 4:29 pm |
|
Reviewer Comments about Global Regions on EPD's?NC-v4.1 MRc2: Environmental Product Declarationsposted by Candice Rogers on Aug 31, 2023, 9:50 amHello- Has anyone encountered review comments from thier EPD's about "global regions" not being specified? "The global region is not indicated on the EPD for the Knauf Eco Batt Insulation (line 28) and USG Sheetrock Brand All Purpose Drywall Joint Compound (line 46) products. In addition, it appears that for Hilti CFS-SP-WB (line 75), Hilti CFS-PL (line 76), Hilti CFS-CID/CP 680 (line 77), and Pilkington Insulated Glazing (line 100) the region is Europe, but the project is in XX, USA. For future submittals, confirm that the EPD provided is appropriate for the project location... Last reply: Candice Rogers, Aug 31, 2023, 11:44 am |