4026 search results for "zero lot line"
Topic | Recent |
---|---|
LEED Registration for 2 buildings on same plotLEED Guidance for Campuses and Multiple Buildingsposted by Pulak Goyal on Jan 4, 2024, 4:33 amDeborah Lucking Director of Sustainability Fentress Architects LEEDuser Expert 258 thumbs up January 4, 2024- 11:19 am As I recall if multiple buildings only share a circulation link, they should be treaed as separate buildings. Lots of additional information here: https://support.usgbc.org/hc/en-us/articles/4417278527635-Multiple-build... Log in or register to post comments Dave Hubka Practice Leader- Sustainability EUA LEEDuser Expert 530 thumbs up January 5, 2024- 9:25 am LEED v4 revised the rule on multiple buildings when compared to v3 and v2. Read through v4 Minimum Program Requirement- Must... Last reply: Dave Hubka, Jan 5, 2024, 9:25 am |
|
LM-83 and spaces greater than 10,000 SFPilot-Credits EQpc116: Daylight in nonregularly occupied spacesposted by Stephanie Graham on Mar 23, 2021, 12:24 pmOpening a new comment. Our Project is a large university campus thermal energy plant and the chiller room alone is over 10,000 SF and the largest space in the building. Our daylight modeler noted that LM-83 typically asks for daylit spaces to be divided (virtually) into segments of less than 10,000 SF. As a workaround we are dividing the room in Revit with a boundary line. Has anyone else had this issue arise, and if so, did you handle this the same way or use another way? Thanks for any feedback. EQpc116 United States ... Last reply: Collin Robinson, Jan 3, 2024, 10:02 am |
|
LEED v4.1 O+M, Energy and Atmosphere- Energy Performance- Arc Platform- CHPEBOM-v4.1 EAp3: Energy Performanceposted by Flotra Stamm on Dec 20, 2023, 6:44 amWe have a question regarding filling out the data information in ARC platform for a CHP. It produces heat (natural Gas) and electricity. The question is now how to asign the electricity that is produced onsite and also the electricty that is counted as an energy input. As far as we understand it, there is only the option for 'generated onsite- renewable' not for other options. For electricity we have the meters:- purchased from grid- electricity input - electricity production Thanks a lot in advance for any help or advise!:) EAp3 Germany ... |
|
Multilevel lighting controlNC-v4.1 EQc6: Interior lightingposted by Michael on Jun 26, 2022, 11:55 pmallow local control over what light hits an individual's workspace and it will keep you in line with the requirements. Log in or register to post comments Karen Joslin Sustainability Lead PAE... Last reply: Karen Joslin, Dec 18, 2023, 12:51 pm |
|
District Chilled WaterPilot-Credits WEpc115: Whole Project Water Use Reductionposted by Richard Thomson on Dec 12, 2023, 3:18 pmHello, We have a project that is rejecting heat into a district chilled water system and thus, does not have any of the onsite HVAC water consumption categories within the calculator. Has anyone attempted to show reduced HVAC water consumption along the lines of v4.1 WEc3 Option 3? WEpc115 ... |
|
(mis)Understanding the LEED Review (and appeal) processLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Susannah Goddard on Apr 28, 2015, 10:04 am(assume there is a list somewhere but I can't locate it).- $500 per credit appeal? That's a hell of a lot of money isn't it?!- For linked credits (e.g. WEc3 is not awarded because WEp1... Last reply: Callie Reymann, Dec 7, 2023, 3:28 pm |
|
Existing Parking LotNC-v4.1 MPR2: Must use reasonable LEED boundariesposted by Laura Soma on Dec 5, 2023, 12:55 pmIf building next to an existing parking lot, which will serve the new structure, does the parking lot footprint need to be included in the LEED project boundaries? Assume there will be minor upgrades to the existing lot (EV charger/ lighting upgrades) MPR2 ... Last reply: Dave Hubka, Dec 6, 2023, 3:43 pm |
|
Does this credit only apply to lighting fixtures installed on masts with mounting heights?NC-v4 SSc6: Light Pollution Reductionposted by Sara BENLOUBA on Nov 27, 2023, 8:16 amto post comments Sara BENLOUBA Green building manager Confidential LEEDuser Basic Member 13 thumbs up November 27, 2023- 9:49 am Dear Glenn, Thanks a lot for your answer. Log in or register to post... Last reply: Devendra Chaughule, Nov 29, 2023, 12:40 am |
|
Building Entrance Vestibule RequirementsNC-v4 EAp2: Minimum Energy Performanceposted by Christopher Russell-King on Jun 12, 2023, 12:36 pmfor workers only from the parking lot and the ground floor are building entrances that should comply. The terrace doors are not building entrances. The definition- "building entrance: any doorway, set... Last reply: Marcus Sheffer, Nov 27, 2023, 11:53 am |
|
tenants meters data collection requirementCS-v4 EAc3: Advanced Energy Meteringposted by Ricardo Sá on Dec 21, 2017, 10:52 amcosts is probably the most effective way to induce energy control behaviors)? Or do you think we will need to install an additional meter (in the same power line of the supplier meter) and connect... Last reply: Julio Fernandez Amodia, Nov 22, 2023, 5:39 am |