Tile Setting Adhesives and GroutNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Jessica Jones on Sep 23, 2010, 9:42 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up September 28, 2010- 11:20 pm Yes, this is a requirement. Unlike the requirement for mineral-based flooring which a lot of people groused about and which was relaxed, I haven't heard any indication about this one being relaxed.On the bright side, given the low emissions it shouldn't be too hard to comply with...? Log in or register to post comments Linda Davisson Senior Sustainability Strategist Jacobs Engineering LEEDuser Premium Member 225 thumbs up September 30, 2010- 12:07 pm Grout... Last reply: Marcio Alberto Casado Pereira, Aug 15, 2012, 1:18 pm |
|
TVOC or not TVOC?Pilot-Credits EQpc21: Low-emitting interiorsposted by Randal Carter on Dec 20, 2010, 7:58 amto measure PCBs in soil due to the inherent bias that the soil matrix introduces into the measurement. Instead you measure PCBs in soil because that is your goal. I see people putting a lot of minutia... Last reply: Dwayne Fuhlhage, Jan 12, 2011, 1:44 pm |
|
Stair Treads and Vinyl Wall BaseNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Joseph Snider on Feb 9, 2011, 10:55 amlooking for. If I were a manufacturer, I would make double-darn sure that my products were correctly listed on the SCS website, since a lot of folks might be specifying products based on what they find (or... Last reply: Lauren Sparandara, Feb 3, 2012, 10:30 am |
|
MRc7 DocumentationNC-2009 MRc7: Certified Woodposted by Maura Adams on Jun 8, 2011, 1:13 pmEnvironmental Stewardship Manager LEEDuser Basic Member 177 thumbs up June 8, 2011- 2:06 pm Good- this is helping. On some lines it says "Mixed 70%" and on others just "Mixed Credit."... Last reply: Jennifer Frey, Jun 8, 2011, 3:45 pm |
|
Recycled Content & FSC Certified Wood Credits Grey AreaNC-2009 MRc7: Certified Woodposted by Roberto Meza on Jul 29, 2011, 5:47 pmIs it ever the case that a product can be represented under both MRc7 and MRc4? This will make a big difference for my project where we have a lot of these wood doors. Log in or register to post comments ... Last reply: Lauren Sparandara, Apr 18, 2013, 1:42 pm |
|
Feedback on the LEED 2009 ACPs for Projects Outside the U.S.General forumsposted by Deon Glaser on Nov 15, 2011, 2:30 pmEric Johnson LEEDuser Premium Member 271 thumbs up November 15, 2011- 3:03 pm Deon, Welcome to the international market. It's great to hear there will be a feedback form for us to provide input on the ACP's. For the most part the items I have reviewed are a good step forward. Log in or register to post comments Susann Geithner Principal Emerald Built Environments LEEDuser Basic Member 1297 thumbs up November 15, 2011- 3:36 pm Thanks a lot for sharing the information. Many users will love to here that they are being heard. I know Jean and I have had many headaches applying an US rating system to projects... Last reply: Eric Johnson, Apr 10, 2015, 1:41 pm |
|
IEQp1- Occupant diversityNC-2009 IEQp1: Minimum indoor air quality performanceposted by susan eguia on Apr 27, 2012, 2:14 pmD= Ps/Summation of Pz (all zones) Page 6-24 of ASHRAE 62.1 2007. Q2: If you got denied using 10% variations,and you still want to use it, then provide a narrative explaining why do you insist. Line... Last reply: Manny Iglesia, May 7, 2012, 6:04 pm |
|
System fan power- BaselineNC-2009 EAp2: Minimum Energy Performanceposted by Luana Bertoletti on Oct 16, 2012, 10:41 amBasic Member 37 thumbs up October 18, 2012- 1:31 pm Hi Marcus, I also read the discussion above. Now things are clear! Thanks a lot! Log in or register to post comments Luana Bertoletti Sustentech... Last reply: Marcus Sheffer, Feb 11, 2013, 10:34 am |
|
ISO 140001 CertificationNC-2009 IDc1: Innovation in Designposted by kathy zarsky on Nov 27, 2012, 6:45 pmtimes. While i did not work directly on that particular issue, my colleagues Jamie and Myrrh did (if those are your contacts). I can share their contact info off line if you wish- robert.phinney@hdrinc.com... Last reply: Anna Foden, Dec 18, 2020, 12:28 pm |
|
CxA contracting for enhanced commissioning in a design&build proNC-2009 EAc3: Enhanced Commissioningposted by Valentin Grimaud on Nov 29, 2012, 7:38 pmit's just I did not see that warning before but, I would say that the problem we are facing now is very typical of D/B projects don't you think? There must be lots of DB projects which cannot earn... Last reply: Scott Bowman, Jul 18, 2013, 12:38 pm |