V4- SSc5- Heat Island Reduction- occupiable roofs

CS-v4 SSc5: Heat Island Reduction
posted by Thomas Gibbons on Sep 14, 2018, 10:26 am

Hi folks, SSc5- Heat Island Reduction Core & Shell V4 Working on an office project with occupiable roofs on floors 3 – 8.  Each outdoor patio consists of green roof and pavers.  The pavers are set up on a pedestal system – below the pedestal system we hold water as a blue roof – all of that sitting upon “the roof” (insulation, weather barrier, deck, etc).  I’m trying to figure out what would be considered roof versus nonroof measure here in regard to the pavers.  I’ve read up on a lot of the discussion on the forums though I haven’t seen something specifically addressing this in v4 (though I could...

Last reply: Glen Boldt, Apr 10, 2024, 1:11 am

getting hot water from CHP, but not the power. Can I still get the credit of the power produced?

NC-v4 EAp2: Minimum Energy Performance
posted by Moses Chong on Apr 4, 2024, 5:31 pm

building's allocation (which is zero). The CHP generated electricity is used only in other buildings of the campus. It's weird I know.  Log in or register to post comments Tyler Thumma 7Group LEEDuser...

Last reply: Tyler Thumma, Apr 9, 2024, 8:19 am

Definition of "Functional Entry"

NC-v4 LTc6: Bicycle facilities
posted by Marion THIBAULT on Jul 6, 2020, 10:11 am

Dear all LEED user, We have a question about the definition of " Functional Entry "? There is a debate in our project team about this. Some consider this to be the main entrance to the building and the other one to the site entrance. What is the exact definition for LEED? Thanks a lot for your answers Marion LTc6 ...

Last reply: Azra, Apr 9, 2024, 3:01 am

MEPC input- Total cooling & heating capacity

CS-v4 EAc2: Optimize Energy Performance
posted by Lenka Matějíčková on Jan 26, 2024, 8:20 am

Hi to All,  I would like to clarify the MEPC calculator inputs for LEEDv4 under C&S.  In the Air-Side HVAC tab: 1/ Cooling & heating capacities: Line 17: Total cooling capacity- do you enter just the capacity of coils in the AHU its self, or include the total capacity, including cooling capacity of terminal units (i.e. FCUs) under that system? Line 21: Total heating capacity- ditto, the same as above, just for heating. 2/ In the Air-Side HVAC tab: Do you also enter systems that don't serve for ventilation, but just for cooling (i.e. server rooms (not data centres though)), or heating (i.e....

Last reply: Lenka Matějíčková, Apr 8, 2024, 3:19 am

Cove.Tool for Quality Views?

NC-v4 EQc8: Quality Views
posted by Michelle Bombeck on Oct 26, 2023, 4:14 pm

Hi Folks- Has anyone had success documenting this credit using the Cove.Tool outputs? While the table Cove provides does detail the necessary criteria, the visual output is too high level to truly align with the documentation requirements- doesn't label spaces, doesn't show view lines, etc. I wanted to see what others had experienced before asking the architect to go through the onerous process of demonstrating the various criteria via floor plan/elevation/sections markup. EQc8 U.S. and Canada ...

Last reply: Michelle Bombeck, Apr 5, 2024, 6:24 pm

Baseline HVAC, Non-regulated loads and Exceptional Calculation Method for V4.1

NC-v4.1 EAp2: Minimum Energy Performance
posted by on Dec 6, 2023, 9:54 pm

for Hazardous Storage and Chemical Space. Should the 75,000 sf pharmaceutical manufacturing space pursue the Exceptional Calculation method to show energy savings if we can establish a standard base line system? Depending on question 2, what is the building type with the largest conditioned floor area as to determine the HVAC system base line (predominanat condition) Project is ASHRAE zone 3A.  Per Table G3.1.1-3,...

Last reply: Tyler Thumma, Apr 5, 2024, 10:12 am

If a parcel crosses the 1/4 mile radius, does it count?

CS-v4 LTc4: Surrounding density and diverse uses
posted by Armond Dai on May 19, 2023, 5:04 pm

On the map I ploted a 1/4 mile radius from the project boundary. There are lot of parcels of buildable land that are partially within the radius and partially outside the radius. Do I include these parcels in the calculation or do I exclude them? Do I only count part of the parcel? LTc4 United States ...

Last reply: Afogreen Build, Apr 3, 2024, 5:14 am

Parking spaces

NC-v4 LTc7: Reduced parking footprint
posted by David O'Connell on Mar 28, 2024, 5:13 am

Gioia Connell Consultant WSP LEEDuser Expert 1 thumbs up March 28, 2024- 3:01 pm Hello fellow *Connell, In our team's experience any parking space that is allocated for use by the building occupants will need to be included, even if they are not new spaces.  So if any of those other parking lots are used in part by occupants, those spaces that are used would need to be counted. We work with the client team to get the answer to this.  Let me know if this helps!  Log in or register to post comments ...

Last reply: Gioia Connell, Mar 28, 2024, 3:01 pm

Exterior concrete curing compound

NC-v4 EQc2: Low-emitting materials
posted by akshaya bhaskar on Mar 27, 2024, 12:40 pm

tar sealants for parking lots and other paved surfaces. Log in or register to post comments akshaya bhaskar LEEDuser Basic Member March 27, 2024- 1:56 pm Thank you! Log in or register to post comments ...

Last reply: akshaya bhaskar, Mar 27, 2024, 1:56 pm

City Potable Water Analysis Reports

NC-v4 WEc3: Cooling tower water use
posted by Saif Abdulameer on Apr 11, 2018, 10:54 am

LEEDuser Expert 32 thumbs up October 30, 2019- 9:44 am Hi there- Just found out that City reports aren't acceptable.  The test must be taken at the main water supply line near the LEED project boundary, so it takes into account any contaminants picked up in the lines  Log in or register to post comments Kelsey Wotila Foresight Management LEEDuser Basic Member 6 thumbs up August 14, 2020- 10:14 am So...

Last reply: Jason Packer, Mar 27, 2024, 11:57 am