Log in

4026 search results for "zero lot line"

Forum
Topic

Envelope & Hazardous Materials

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Emily G on May 12, 2011, 7:38 pm

be "deleted" from calculations but any structurally unsound material. I found a CIR and saved it and can email it to anyone who wants to see it. We are renovating a house from 1813 (will be a museum) where a lot...

Last reply: Debra a. Lombard, Oct 17, 2017, 5:15 pm

User group for an added separate ADA restroom

CI-2009 WEp1: Water Use Reduction
posted by Susann Geithner on May 26, 2011, 1:10 pm

will not be able to use urinals. All male occupants expected to use the unisex restroom must be counted as having three water closet uses per day and zero urinal uses per day. This is why it is suggested...

Last reply: Erin Holdenried, Jul 13, 2012, 9:47 am

Clarification for credit application

Pilot-Credits WEpc18: Appliance and process water use reduction
posted by monu goyal on Jun 29, 2011, 2:38 am

on this: the concern of earning a point for such a small water user came up a lot in public comment, so for the 2nd public comment version of this credit (available in July) there will be some minimum use...

Last reply: Jennifer Knocha, Sep 5, 2013, 10:44 am

Non-U.S. Regional Priority Credits for LEED ND

General forums
posted by Jaume Albertí on Jul 27, 2011, 5:16 am

Hi there, What about regional priority credits outside the US concerning to LEED Neighbourhood Development certification system? I have seen they exists for LEED NC, C&S, Schools, Retail, CI, EBOM, but nothing related to LEED ND. Thanks a lot! J LEED ...

Last reply: Melissa Merryweather, Feb 22, 2013, 10:06 pm

Information: Regional Priority Credit on International Projects?

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by Raymond Loo on Jul 28, 2011, 9:53 pm

still enter a character. Try inserting zero "0" in the Zip/Postal Code field then the rest of your query will be explained, such as what is the minimum threshold RPC requirement for that credit....

Last reply: Raymond Loo, Jul 29, 2011, 10:15 pm

Quality View credit for K-5 school- line of sight for children

Schools-2009 IEQc8.2: Daylight and views - views
posted by Gendel Metlitsky on Aug 2, 2011, 10:35 am

Reference Guide (2009 Edition, Update 2010), on page 566, under Section 4. Implementation, it states "The line of sight used...is assumed to be 42 inches for the average seated adult, but is lower...

Last reply: TODD REED, Jul 9, 2012, 11:51 am

Clarification on prescriptive option skylight/floor area ratio

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Jason Levine on Aug 3, 2011, 6:57 pm

space area, or 3-6% of toplighting zone (caluculated by the 35degree line, etc)? Log in or register to post comments ...

Last reply: Adrienn Gelesz, Apr 4, 2014, 11:53 am

Above and Beyond

Pilot-Credits EQpc24: Acoustics
posted by Dan LeBlanc on Aug 8, 2011, 2:55 pm

in Chapter 48, Table 1 of the 2011 ASHRAE Handbook. An acoustical model was used to determine the amount of sound level reduction required to meet these guidelines. Silencers, sound boots, and lined ductwork...

Last reply: Deborah Lucking, Sep 25, 2013, 1:04 pm

Keep the EPD credit, but don't inlcude wood

General forums
posted by Mara Baum on Sep 1, 2011, 1:33 pm

average for a product category and only the 2X value Product EPD credit is for an EPD of a specific manufacturer’s product or product line. He further explained that the USGBC has designed the credit...

Last reply: Lyle Axelarris, Sep 12, 2011, 4:33 pm

Fundamental Commissioning

General forums
posted by Scott Bowman on Sep 8, 2011, 11:35 am

Following are some comments I would like to make to USGBC related to Fundamental Commissioning (and by reference to Enhanced): 1. The definitions seem very vague related to systems, by mentioning just Mechanical and Electrical. What about emergency generation? Electrical distribution? Many of these are important to Cx, but many clients already balk at the Cx fees required, and this would dramatically expand that scope. Perhaps this will be expanded in the reference guide, but it needs to be fairly specific. There are a lot of Cx providers out there that are using very minimal scopes to get...

Last reply: Dan Forino, Apr 19, 2012, 12:45 pm