Log in

4026 search results for "zero lot line"

Forum
Topic

Daylight Analysis

NC-2009 IEQc8.1: Daylight and views - daylight
posted by SAMY Chamy on Jun 15, 2016, 8:03 am

and tell you the areas that are compliant at both simulation times. For a lot of rooms, I imagine the 9AM and 3PM areas overlap pretty closely. But, for those that don't, I overlay the images and do my...

Last reply: GBD Architects, Sep 13, 2017, 12:18 pm

Filling out the C&D waste Calculator

NC-v4 MRc5: Construction and demolition waste management
posted by Jenelle Shapiro on May 18, 2016, 12:05 pm

situation, you could use the Material Description column to describe any differences between your two wood streams. 2. In the scenario you describe- at first I thought- yes use two lines- if some wood...

Last reply: RETIRED, Feb 25, 2019, 6:34 pm

Simple box model

NC-v4 IPc1: Integrative process
posted by Edgar Arevalo on May 1, 2017, 5:49 pm

will follow the letter of the requirements that we have not assessed "at least two potential load reduction strategies for each aspect" and not approve the approach even if it is in line...

Last reply: Oliver Pearce, Oct 11, 2019, 6:08 am

Tenant Guidelines credit substitution to v4?

CS-2009 SSc9: Tenant Design and Construction Guidelines
posted by Maria Porter on Sep 20, 2017, 5:34 am

I have created myself and it has both a lot of Swedish in it (with English translations for the reviewer) as well as company specific information in it. So no, I can’t share it. And no I can’t find any...

Last reply: Allen Cornett, Jan 23, 2020, 11:10 am

tenants meters data collection requirement

CS-v4 EAc3: Advanced Energy Metering
posted by Ricardo Sá on Dec 21, 2017, 10:52 am

costs is probably the most effective way to induce energy control behaviors)? Or do you think we will need to install an additional meter (in the same power line of the supplier meter) and connect...

Last reply: Julio Fernandez Amodia, Nov 22, 2023, 5:39 am

Multiple Buildings in One Energy Simulation

NC-2009 EAp2: Minimum Energy Performance
posted by PAWAN DAHIWAL on Apr 11, 2018, 6:40 am

model" could be a choice, but it would be a very time-consuming one since there are a lot of different buildings and it would enlarge enormously the size of the MEPC and the number of tabs.- "Model...

Last reply: Manuel Romera Molina, Jun 17, 2024, 10:54 am

Vague extraction location distance

NC-2009 MRc5: Regional Materials
posted by Edgar Arevalo on Aug 26, 2019, 11:08 am

there's a lot on this on leeduser do a search for such Log in or register to post comments Edgar Arevalo Associate LEEDuser Basic Member 18 thumbs up August 26, 2019- 2:07 pm Understood, Keith. ...

Last reply: Edgar Arevalo, Aug 27, 2019, 3:48 pm

LEED v5 BD+C/ID+C Materials and Resources public comments

LEED v5 BD+C/ID+C: Materials and Resources Public Comments
posted by Nadav Malin on Apr 3, 2024, 6:25 am

to be implemented if product needs to be shipped across the country (lot of carbon emissions) versus just donating to local habitat for humanity. Log in or register to post comments Megan Zack Chief Sustainability...

Last reply: Jodie Thill, May 24, 2024, 1:31 pm

Last chance to comment on LEED v5

LEED v5 BD+C/ID+C: Location and Transportation 2nd Public Comment
posted by Nadav Malin on Sep 27, 2024, 9:56 am

by auto manufacturers as "zero-emission vehicle, one that emits only water vapor as it carries people down the road per Car and Driver. These vehicles "emit no carbon dioxide or other harmful...

Last reply: Lenka Matějíčková, Oct 31, 2024, 12:21 pm

Glare Control and Partitions

NC-2009 IEQc8.1: Daylight and views - daylight
posted by April Ambrose on Apr 15, 2010, 5:41 pm

greater value for your time and money by hiring a daylighting consultant. Not only will they do the simulations but they will teach you a lot about the practical application of daylighting and human...

Last reply: Jill Perry, PE, Dec 9, 2011, 12:20 pm