The building in question has both electric and gas usage.  The project is attempting to submeter the chillers to satisfy the tenant level requirement for advanced metering.  It is estimated that these units consume approximately 15% of the electrical load.  Does this meet the 10% requirement or is the credit looking for 10% of the overall use?