Schools-NC-v4.1 SSc7: Site Master Plan 1 point

See all forum discussions about this credit »
View the LEED v4 version of this credit »

SPECIAL REPORT

LEEDuser expert

Steve Loppnow

LEED AP BD+C, Homes, EB:OM

Stok
Sustainability Account Manager

SPECIAL REPORT

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

The project must achieve at least four of the following six credits, using the associated calculation methods. The achieved credits must then be recalculated using the data from the master plan.

  • LT Credit: High Priority Site
  • SS Credit: Site Development—Protect or Restore Habitat
  • SS Credit: Open Space
  • SS Credit: Rainwater Management
  • SS Credit: Heat Island Reduction
  • SS Credit: Light Pollution Reduction
A site master plan for the school must be developed in collaboration with school authorities. Previous sustainable site design measures should be considered in all master-planning efforts so that existing infrastructure is retained whenever possible. The master plan must therefore include current construction activity plus future construction (within the building’s lifespan) that affects the site. The master plan development footprint must also include parking, paving, and utilities. Projects where no future development is planned are not eligible for this credit. See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

LEEDuser expert

Steve Loppnow

LEED AP BD+C, Homes, EB:OM

Stok
Sustainability Account Manager

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

The project must achieve at least four of the following six credits, using the associated calculation methods. The achieved credits must then be recalculated using the data from the master plan.

  • LT Credit: High Priority Site
  • SS Credit: Site Development—Protect or Restore Habitat
  • SS Credit: Open Space
  • SS Credit: Rainwater Management
  • SS Credit: Heat Island Reduction
  • SS Credit: Light Pollution Reduction
A site master plan for the school must be developed in collaboration with school authorities. Previous sustainable site design measures should be considered in all master-planning efforts so that existing infrastructure is retained whenever possible. The master plan must therefore include current construction activity plus future construction (within the building’s lifespan) that affects the site. The master plan development footprint must also include parking, paving, and utilities. Projects where no future development is planned are not eligible for this credit.