LEED CREDIT

Healthcare-v4.1 IPp1: Integrative project planning and design Required

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Use cross-discipline design and decision making, beginning in the programming and pre-design phase. At a minimum, ensure the following process:

Owner’s Project Requirements Document.
Prepare an Owner’s Project Requirements (OPR) document. Develop a health mission statement and incorporate it in the OPR. The health mission statement must address "triple bottom line" values—economic, environmental and social. Include goals and strategies to safeguard the health of building occupants, the local community and the global environment, while creating a high-performance healing environment for the building’s patients, caregivers and staff.
Preliminary Rating Goals.
As early as practical and preferably before schematic design, conduct a preliminary LEED meeting with a minimum of four key project team members and the owner or owner’s representative. As part of the meeting, create a LEED® action plan that, at a minimum:
  • Determines the LEED certification level to pursue (Certified, Silver, Gold, or Platinum);
  • Selects the LEED credits to meet the targeted certification level; and
  • Identifies the responsible parties to ensure the LEED requirements for each prerequisite and selected credit are met.
Integrated Project Team.
Assemble an integrated project team and include as many of the following professionals as feasible (minimum of four), in addition to the owner or owner’s representative.
  • Owner’s capital budget manager
  • Architect or building designer
  • Mechanical engineer
  • Structural engineer
  • Energy modeler
  • Equipment planner
  • Acoustical consultant
  • Telecommunications designer
  • Controls designer
  • Food Service Consultant
  • Infection Control Staff
  • Building science or performance testing agents
  • Green building or sustainable design consultant
  • Facility green teams
  • Physician and nursing teams
  • Facility managers
  • Environmental services staff
  • Functional and space programmers
  • Commissioning agent
  • Community representatives
  • Civil engineer
  • Landscape architect
  • Ecologist
  • Land planner
  • Construction manager or general contractor
  • Life cycle cost analyst; construction cost estimator
  • Lighting designer
  • Other disciplines appropriate to the specific project type
Design Charrette.
As early as practical and preferably before schematic design, conduct a minimum four-hour , integrated design charrette with the project team as defined above. The goal is to optimize the integration of green strategies across all aspects of building design, construction and operations, drawing on the expertise of all participants. See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Use cross-discipline design and decision making, beginning in the programming and pre-design phase. At a minimum, ensure the following process:

Owner’s Project Requirements Document.
Prepare an Owner’s Project Requirements (OPR) document. Develop a health mission statement and incorporate it in the OPR. The health mission statement must address "triple bottom line" values—economic, environmental and social. Include goals and strategies to safeguard the health of building occupants, the local community and the global environment, while creating a high-performance healing environment for the building’s patients, caregivers and staff.
Preliminary Rating Goals.
As early as practical and preferably before schematic design, conduct a preliminary LEED meeting with a minimum of four key project team members and the owner or owner’s representative. As part of the meeting, create a LEED® action plan that, at a minimum:
  • Determines the LEED certification level to pursue (Certified, Silver, Gold, or Platinum);
  • Selects the LEED credits to meet the targeted certification level; and
  • Identifies the responsible parties to ensure the LEED requirements for each prerequisite and selected credit are met.
Integrated Project Team.
Assemble an integrated project team and include as many of the following professionals as feasible (minimum of four), in addition to the owner or owner’s representative.
  • Owner’s capital budget manager
  • Architect or building designer
  • Mechanical engineer
  • Structural engineer
  • Energy modeler
  • Equipment planner
  • Acoustical consultant
  • Telecommunications designer
  • Controls designer
  • Food Service Consultant
  • Infection Control Staff
  • Building science or performance testing agents
  • Green building or sustainable design consultant
  • Facility green teams
  • Physician and nursing teams
  • Facility managers
  • Environmental services staff
  • Functional and space programmers
  • Commissioning agent
  • Community representatives
  • Civil engineer
  • Landscape architect
  • Ecologist
  • Land planner
  • Construction manager or general contractor
  • Life cycle cost analyst; construction cost estimator
  • Lighting designer
  • Other disciplines appropriate to the specific project type
Design Charrette.
As early as practical and preferably before schematic design, conduct a minimum four-hour , integrated design charrette with the project team as defined above. The goal is to optimize the integration of green strategies across all aspects of building design, construction and operations, drawing on the expertise of all participants.