Log in
LEED v2009
Healthcare
Sustainable Sites
Stormwater design - quality control

LEED CREDIT

Healthcare-v2009 SSc6.2: Stormwater design - quality control 1 point

See all forum discussions about this credit »

LEEDuser expert

Gregory Hurst

Robert Peccia & Associates
Office Manager

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Implement a stormwater management plan that reduces impervious cover, promotes infiltration and captures and treats the stormwater runoff from 90% of the average annual rainfall1 using acceptable best management practices (BMPs). BMPs used to treat runoff must be capable of removing 80% of the average annual postdevelopment total suspended solids (TSS) load based on existing monitoring reports. BMPs are considered to meet these criteria if:

  • They are designed in accordance with standards and specifications from a state or local program that has adopted these performance standards.
OR
  • There exists infield performance monitoring data demonstrating compliance with the criteria. Data must conform to accepted protocol (e.g., Technology Acceptance Reciprocity Partnership [TARP], Washington State Department of Ecology) for BMP monitoring.
1 There are 3 distinct climates in the United States that influence the nature and amount of annual rainfall. Humid watershed are defined as those that receive at least 40 inches of rainfall each year, Semiarid watersheds receive between 20 and 40 inches of rainfall per year, and arid watersheds receive less than 20 inches of rainfall per year. For this credit, 90% of the average annual rainfall is equivalent to treating the runoff from the following (based on climate): Humid Watershed - 1 inch of rainfall Semiarid Watersheds - 0.75 inches of rainfall Arid Watersheds - 0.5 inches of rainfall.
SITES-LEED Equivalency
This LEED credit (or a component of this credit) has been established as equivalent to a SITES v2 credit or component. For more information on using the equivalency as a substitution in your LEED or SITES project, see this article and guidance document.
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Addenda

11/1/2011
LEED Interpretation
Inquiry:

How can a project earn exemplary performance for Stormwater Quantity and Quality?

Ruling:

The exemplary performance requirements for SSc6.1 Stormwater Quantity and SSc6.2 Stormwater Quality listed in the LEED Green Building Design & Construction Reference Guide call for (1) a comprehensive approach to capture and treat stormwater runoff and (2) demonstrated performance above and beyond the credit requirements. To expand and clarify what these two requirements refer to, the following additional guidance is provided.SSc6.1 Stormwater QuantityTo demonstrate a comprehensive approach and performance above and beyond the credit requirements, the stormwater management strategies must:1. Address runoff from the entire development footprint of the site using Low Impact Development (LID) practices. 2. Achieve the following stormwater quantity performance:a. Case 1, Option 1: Achieve a post-development peak discharge rate and quantity that is equivalent to those calculated for the pre-Columbian site conditions.b. Case 1, Option 2: No EP available for his compliance path.c. Case 2: Achieve a 50% reduction in the volume of runoff during the 2-year 24-hour design storm.LID is defined as an approach to managing stormwater runoff that emphasizes on-site natural features to protect water quality by replicating the pre-development hydrologic regime of watersheds and addressing runoff close to its source. Examples include better site design principles such as minimizing land disturbance, preserving vegetation, minimizing impervious cover, and design practices like rain gardens, vegetated swales and buffers, permeable pavement, and soil amendments. These are engineered practices that may require specialized design assistance.SSc6.2 Stormwater QualityTo demonstrate a comprehensive approach and performance above and beyond the credit requirements, the best management practices employed must be non-structural, conforming to LID practices as defined above, and should be designed to remove at least 80% of the average annual total suspended solids (TSS) from twice the rainfall volume required for the base credit (i.e, runoff generated from 1 inch of rain in an arid climate, 1.5 inches of rain in a semiarid climate, and 2 inches of rain in a humid climate).To document compliance with these requirements, a detailed narrative or stormwater management plan summary should be provided that describes the exemplary performance approach and includes calculations that clearly highlight compliance with the exemplary performance requirements. As the exemplary performance requirements for these two credits overlap considerably, only one SSc6 EP point is available to projects.

Campus Applicable
No
Internationally Applicable:
No
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

LEEDuser expert

Gregory Hurst

Robert Peccia & Associates
Office Manager

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Implement a stormwater management plan that reduces impervious cover, promotes infiltration and captures and treats the stormwater runoff from 90% of the average annual rainfall1 using acceptable best management practices (BMPs). BMPs used to treat runoff must be capable of removing 80% of the average annual postdevelopment total suspended solids (TSS) load based on existing monitoring reports. BMPs are considered to meet these criteria if:

  • They are designed in accordance with standards and specifications from a state or local program that has adopted these performance standards.
OR
  • There exists infield performance monitoring data demonstrating compliance with the criteria. Data must conform to accepted protocol (e.g., Technology Acceptance Reciprocity Partnership [TARP], Washington State Department of Ecology) for BMP monitoring.
1 There are 3 distinct climates in the United States that influence the nature and amount of annual rainfall. Humid watershed are defined as those that receive at least 40 inches of rainfall each year, Semiarid watersheds receive between 20 and 40 inches of rainfall per year, and arid watersheds receive less than 20 inches of rainfall per year. For this credit, 90% of the average annual rainfall is equivalent to treating the runoff from the following (based on climate): Humid Watershed - 1 inch of rainfall Semiarid Watersheds - 0.75 inches of rainfall Arid Watersheds - 0.5 inches of rainfall.
SITES-LEED Equivalency
This LEED credit (or a component of this credit) has been established as equivalent to a SITES v2 credit or component. For more information on using the equivalency as a substitution in your LEED or SITES project, see this article and guidance document.

LEEDuser expert

Gregory Hurst

Robert Peccia & Associates
Office Manager

See all LEEDuser forum discussions about this credit » Unsubscribe from discussions about Healthcare-v2009 SSc6.2