Require that your contractor submit an IAQ Management Plan early in construction, before interior work has begun. The plan should detail the approach to this credit, as well as EQc3.1 if both credits are being pursued.
Consider whether your HVAC system will be able to power a flush-out while maintaining temperature and humidity levels during seasonal extremes in a timely fashion, without major scheduling impacts. A total of 14,000 cubic feet of outside air must be exchanged for every square foot of floor area. The amount of outside air prescribed during a phased flush-out (0.3 CFM) may be several times greater than the normal rate required for a project’s occupancy, based on ASHRAE 62.1-2004, as required by EQp1: Minimum IAQ Performance.
Do not include land-clearing debris or excavated soil or rock in your calculations. Even if diverted from landfill, it is not to be included in the credit calculations. Contractors often think that trees and stumps are still part of the diverted waste, but take them out of the LEED submittal template and supporting documentation if the contractor includes them.
If you choose to pursue EQc5: Indoor Chemical and Pollutant Source Control, relatively high MERV 13 filtration is required. Pursuing both credits may require you to increase duct size and fan power, and may even affect your system selection.