Make sure you document the early design requirements as they take place. Going back for documentation later is not helpful and very time consuming for the team.
Provide a copy of the New Buildings Institute Advanced Buildings: Core Performance Guide to each team member. The guide is available to download free from the NBI website. (See Resources.)
Develop a checklist of all requirements, and assign responsible team members to accomplish them. Hold a meeting to walk the team through the AEDG checklist for your project’s climate zone. Clarify specific design goals and prescriptive requirements in the OPR for EAp1: Fundamental Commissioning.
Provide a copy of the AEDG to each team member as everyone, including the architect, mechanical and electrical engineers, lighting designer, and commissioning agents, are responsible for ensuring compliance. These are available to download free from the ASHRAE website.
Even if you’re using Option 1, refer to the Advanced Energy Design Guides and Core Performance Guide (referenced by Options 2 and 3) for ideas on cost-effective measures to implement.
All compliance path options may require both the architectural and engineering teams to take some time in addition to project management to review the prescriptive checklists, fill out the LEED Online submittal template, and develop the compliance document.
Options 2 and 3 require additional consultant time from architects and MEP engineers over typical design and documentation commitment, which means higher upfront costs.
Begin by identifying a target for energy performance by researching similar building types using the EPA Target Finder program. An Energy Star score of 80 or higher will typically earn EAc1 points.