If manual overrides are available for occasional after-hours use, check that lighting system controls are restored to normal shut-off schedules following any overrides.
Measure the night illumination levels at regularly spaced points around the perimeter of the property, taking the measurements with the building’s exterior and site lights both on and off. The building’s interior lights must be in the same state during both measurements.
Documentation is streamlined for LEED-certified projects. If the project is certified under LEED-NC or LEED for Schools, show that SSc8: Light Pollution Reduction was earned. If the project is certified under LEED-CS and 75% of the floor area is LEED-CI, show that SSc8: Light Pollution Reduction was earned for both systems.