Daylighting controls can be set and tailored for each space. The facility manager or another designated person should be in charge of adjusting the settings to meet the needs of occupants.
For Option 3, take daylight measurements with a hand-held light meter and record the values on a 10 foot x10 foot grid plan. Enter square footage of regularly occupied areas, and total area of regularly occupied space that meet the daylight requirements in the LEED Submittal Template. Upload all required supporting documents to LEED Online.
For Option 2, enter square footage of regularly occupied areas, and total area of regularly occupied space that meets the daylight requirements in the LEED Submittal Template. In addition, upload all required supporting documents to LEED Online.