Timer controls and automatic switches should be commissioned and inspected for performance periodically throughout their life to ensure they continue to serve the intent of the credit requirements.
Project phase:
Credit tip type:
Timer controls and automatic switches should be commissioned and inspected for performance periodically throughout their life to ensure they continue to serve the intent of the credit requirements.