Most M&V programs submeter individual systems such as lighting, heating, and cooling. Plug loads are not always submetered individually, it is easiest to individually submeter larger items and subtract the totaled submeter number from the total building usage to get the estimated plug load number.
Project phase:
Credit tip type: