Log in

The mechanical engineer begins preliminary ventilation rate calculations during project programming in order to set ventilation quality goals for particular spaces and occupancies.

The mechanical engineer begins preliminary ventilation rate calculations during project programming in order to set ventilation quality goals for particular spaces and occupancies. The area of a given multi‐zone system should be broken down by ventilation zones, and all zones within that system must meet the minimum breathing zone ventilation air requirements as per ASHRAE 62.1‐2004. For a typical office space, the mechanical design consists of multiple ventilation zones for which compliance would need to be shown on an individual basis.

Project phase: 
Credit tip type: