It may be tempting to determine a baseline irrigation use by using the calculation methodology for Option 2 and then compare that value to the actual metered irrigation data but that is not allowed. The calculation methodology must be consistent between the baseline and installed cases.
Credits:
Project phase:
Credit tip type: