For buildings with exterior lighting that has appropriate shielding, it is probably simpler to show compliance with Option 2 than to perform the perimeter illumination measurements required for Option 3.
Credits:
Project phase:
Credit tip type:
For buildings with exterior lighting that has appropriate shielding, it is probably simpler to show compliance with Option 2 than to perform the perimeter illumination measurements required for Option 3.